//

PENENTUAN PRIORITAS PENINGKATAN JALAN DI KABUPATEN PIDIE JAYA BERDASARKAN KRITERIA AKSESIBILITAS, JUMLAH PENDUDUK DAN PENGEMBANGAN WILAYAH

BACA FULL TEXT ABSTRAK Pemesanan Versi cetak
Pengarang AHMAD IRVAN ANTONY HAS - Personal Name

Abstrak/Catatan

PENENTUAN PRIORITAS PENINGKATAN JALAN DI KABUPATEN PIDIE JAYA BERDASARKAN KRITERIA AKSESIBILITAS, JUMLAH PENDUDUK, DAN PENGEMBANGAN WILAYAH Ahmad Irvan Antony Has NIM 1509200060079 Program Studi Magister Teknik Sipil Jurusan Teknik Sipil - Fakultas Teknik Universitas Syiah Kuala Abstrak Pemerintah Kabupaten Pidie Jaya melalui Dinas Pekerjaan Umum (PU), telah mengusulkan peningkatan jalan ke Kementerian Pekerjaan Umum dan Perumahan Rakyat (PUPR) sebanyak 5 ruas untuk ditingkatkan pada tahun 2021 dengan total biaya sebesar Rp. 16.731.593.750. Rencana usulan peningkatan jalan tersebut tidak dapat ditingkatkan semua pada tahun 2021, karena Pemerintah Pusat telah menfokuskan kembali (refocusing) anggaran untuk penanganan Corona Virus Disease 2019 (Covid 19) di seluruh wilayah Indonesia. Penelitian ini bertujuan untuk menganalisis kriteria yang dominan perlu dipertimbangkan dalam peningkatan jalan di Kabupaten Pidie Jaya dan menganalisis urutan prioritas peningkatan jalan di Kabupaten Pidie Jaya berdasarkan kriteria aksesibilitas, jumlah penduduk, dan pengembangan wilayah. Penelitian ini menggunakan pendekatan metode kuantitatif melalui kuesioner. Teknik pengambilan sampel (sampling) yang digunakan adalah purposive sampling yaitu pengambilan sampel dengan pertimbangan yang didasarkan pada pemangku kepentingan dan pengambil kebijakan (stakeholders) yang mengetahui kondisi kriteria pada lokasi usulan peningkatan jalan di Kabupaten Pidie Jaya. Responden dalam penelitian ini ditetapkan sebanyak 5 stakeholders yaitu Kepala Bidang Bina Marga Dinas PU Kabupaten Pidie Jaya, Kepala Bidang Perencanaan Sarana dan Prasarana Badan Perencanaan Pembangunan Daerah (Bappeda) Kabupaten Pidie Jaya, Kepala Bidang Perhubungan Jalur Darat Dinas Perhubungan Kabupaten Pidie Jaya, Anggota Komisi D Bidang Pembangunan Dewan Perwakilan Rakyat Kabupaten (DPRK) Pidie Jaya, dan Akademisi Universitas Syiah Kuala. Teknik analisis data digunakan statistik deskriptif dan Analytical Hierarchy Process (AHP). Hasil penelitian menunjukkan bahwa kriteria yang dominan perlu dipertimbangkan dalam peningkatan jalan adalah kriteria aksesibilitas dengan nilai rata-rata gabungan eigen sebesar 0,38. Prioritas peningkatan jalan berdasarkan kriteria aksesibilitas, jumlah penduduk, dan pengembangan wilayah adalah Jalan Simpang Pertanian - Cot Trieng – Rungkom sebagai prioritas 1 dengan bobot sebesar 0,34 dan Jalan Trienggadeng - Panton Beurasan - Cubo sebagai prioritas 2 dengan bobot sebesar 0,24. Kata Kunci: Prioritas, peningkatan, jalan, aksesibilitas, kependudukan, pengembangan, wilayah DETERMINATION OF PRIORITIES FOR INCREASING ROADS IN PIDIE JAYA DISTRICT BASED ON ACCESSIBILITY CRITERIA, POPULATION AND REGION DEVELOPMENT Ahmad Irvan Antony Has Student Number 1509200060079 Master Program of Civil Engineering Civil Engineering Department of Engineering Faculty University Syiah Kuala Abstract The Pidie Jaya Regency Government through the Public Works (PU) Office, has proposed an increase in the road to the Ministry of Public Works and Public Housing (PUPR) of 5 sections to be upgraded in 2021 with a total cost of Rp. 16,731,593,750. The proposed road improvement plan cannot all be upgraded in 2021, because the Central Government has refocused the budget for handling Corona Virus Disease 2019 (Covid 19) throughout Indonesia. This study aims to analyze the dominant criteria that need to be considered in road improvement in Pidie Jaya Regency and to analyze the priority order of road improvement in Pidie Jaya Regency based on the criteria of accessibility, population, and regional development. This research uses a methods quantitative through a questionnaire. The sampling technique used was purposive sampling, namely sampling with considerations based on stakeholders and policy makers (stakeholders) who know the conditions of the criteria at the proposed location for road improvement in Pidie Jaya Regency. Respondents in this study were assigned as many as 5 stakeholders, namely the Head of the Highways Division of the Public Works Office of Pidie Jaya Regency, the Head of the Facility and Infrastructure Planning Division of the Regional Development Planning Agency (Bappeda) Pidie Jaya Regency, the Head of the Land Line Transportation Division of the Pidie Jaya Regency Transportation Service, Member of Commission D Pidie Jaya District People's Representative Council (DPRK) Development Sector, and Syiah Kuala University Academics. The data analysis technique used descriptive statistics and Analytical Hierarchy Process (AHP). The results showed that the dominant criterion that needs to be considered in road improvement is the accessibility criterion with a combined eigenvalues of 0.38. The priority for road improvement based on the criteria of accessibility, population, and area development is the Agricultural Junction - Cot Trieng - Rungkom Road as priority 1 with a weight of 0.34 and Jalan Trienggadeng - Panton Beurasan - Cubo as priority 2 with a weight of 0.24. Key Words: Priority, improvement, roads, accessibility, population, development, territory

Tempat Terbit
Literature Searching Service

Hard copy atau foto copy dari buku ini dapat diberikan dengan syarat ketentuan berlaku, jika berminat, silahkan hubungi via telegram (Chat Services LSS)

Share Social Media

Tulisan yang Relevan

PENENTUAN PRIORITAS PENINGKATAN JALAN DI KABUPATEN PIDIE JAYA BERDASARKAN KRITERIA AKSESIBILITAS, JUMLAH PENDUDUK DAN PENGEMBANGAN WILAYAH (AHMAD IRVAN ANTONY HAS, 2021)

PENENTUAN SKALA PRIORITAS PROYEK PEMBANGUNAN JALAN DI KABUPATEN ACEH JAYA (Rahmad Fuadi, 2017)

EVALUASI KONDISI JALAN DI DAERAH KUMUH DAN STUDI PENENTUAN PRIORITAS PENANGANAN JALAN DI KABUPATEN PIDIE (STUDI KASUS:KECAMATAN KOTA SIGLI) (HENDRA SATRYA, 2018)

EVALUASI KONDISI JALAN DI DAERAH KUMUH DAN STUDI PENENTUAN PRIORITAS PENANGANAN JALAN DI KABUPATEN PIDIE (HENDRA SATRYA, 2018)

PRIORITAS PENGEMBANGAN JARINGAN JALAN PROVINSI UNTUK MENDUKUNG RENCANA INDUK PELABUHAN (RIP) ACEH DENGAN METODE ANALISIS MULTI KRITERIA (Mukhlis Ramli, 2017)

  Kembali ke sebelumnya

Pencarian

Advance



Jenis Akses


Tahun Terbit

   

Program Studi

   

© UPT. Perpustakaan Universitas Syiah Kuala 2015     |     Privacy Policy