ANALISIS BIAYA MATERIAL DAN TENAGA KERJA PADA PROYEK LANJUTAN PEMBANGUNAN GUDANG MOBIL KANTOR GUBERNUR
Pengarang
Fitriani - Personal Name;
Dosen Pembimbing
Nurisra - 197010011997022001 - Dosen Pembimbing I
Nomor Pokok Mahasiswa
1904001010039
Fakultas & Prodi
Fakultas Teknik / Teknik Sipil (D3) / PDDIKTI : 22401
Subject
Kata Kunci
Penerbit
Banda Aceh : Fakultas Teknik (D3)., 2023
Bahasa
No Classification
-
Literature Searching Service
Hard copy atau foto copy dari buku ini dapat diberikan dengan syarat ketentuan berlaku, jika berminat, silahkan hubungi via telegram (Chat Services LSS)
Biaya merupakan salah satu aspek penting dalam siklus kegiatan usaha dan industri konstruksi. Kesuksesan kontraktor tergantung pada kemampuan estimator dalam melakukan analisis biaya dan perhitungan volume pekerjaan. Permasalahan yang ditinjau pada perencanaan proyek adalah berapa komposisi biaya material dan tenaga kerja yang dibutuhkan untuk pelaksanaan proyek gudang mobil. Proyek Lanjutan Pembangunan Gudang Mobil Kantor Gubernur merupakan lanjutan pembangunan dari tahap 1. Proyek ini merupakan gedung 1 lantai dengan luas bangunan 405 m2, perhitungan dan analisa yang dilakukan mencakup perhitungan biaya material dan tenaga kerja dengan menggunakan Analisa Harga Satuan Pekerjaan (AHSP) 2022. Dari hasil perhitungan estimasi yang didapatkan untuk biaya Material sebesar Rp.829.282.522,10 dan upah Tenaga Kerja sebesar Rp.291.431.401,85. Sedangkan proporsi persentase yang didapat pada biaya upah tenaga kerja senilai 24% dan biaya material senilai 76%.
Kata Kunci : Perhitungan Biaya Material Dan Upah te
Cost is an important aspect in the cycle of business activities and the construction industry. The success of the contractor depends on the ability of the estimator to carry out cost analysis and work volume calculations. The problem reviewed in project planning is the composition of the material and labor costs required for the implementation of the car warehouse project. The Continuation Project for the Construction of the Governor's Office Car Warehouse is a continuation of development from phase 1. This project is a 1-storey building with a building area of 405 m2, the calculations and analysis carried out include calculating material and labor costs using the Work Unit Price Analysis (AHSP) 2022. From the results of the estimation calculation obtained for Material costs of IDR 829,282,522.10 and Labor wages of IDR 291,431,401.85. While the proportion of the percentage obtained on the cost of labor wages is 24% and material costs are 76%. Keywords: Calculation of Material Costs and Wages te
ESTIMASI KEBUTUHAN MATERIAL DANRNTENAGA KERJA PADA PROYEK REHABILITASIRNDAN RENOVASI SARANA DAN PRASARANARNSEKOLAH SMP NEGERI 3 BIREUEN (Ali Mursam, 2022)
IDENTIFIKASI FAKTOR-FAKTOR PRODUKTIVITAS TENAGA KERJA YANG DOMINAN TERHADAP KINERJA BIAYA PROYEK KONSTRUKSI (Zuananda Azami, 2016)
PERENCANAAN JADWAL TENAGA KERJA PADA PROYEK PEMBANGUNAN SALURAN DRAINASE PIDIE JAYA LANJUTAN (PAKET III) DI KABUPATEN PIDIE JAYA (FEBRIZA RISKI PRATAMA, 2021)
PERENCANAAN KEBUTUHAN MATERIAL PADARNPROYEK PEMBANGUNAN ASRAMA 2 LANTAIRNBARU DAN LANJUTAN ASRAMA LANTAI 3 DAYAHRNBABUSSALAM AL-AZIZIYAH PUTRA (MUHAMMAD FURQAN, 2022)
PROPORSI BIAYA SUMBER DAYA MANUSIA, MATERIAL DAN ALAT PADA PROYEK KONSTRUKSI JALAN (BERRIL MUFARDIS, 2019)