Search :

Advance


OPTIMASI PRODUKSI BUCKET WHEEL EXCAVATOR DENGAN METODE PERHITUNGAN RENCANA (SPESIFIC PRODUCTION FACTOR) DAN PERHITUNGAN TEORITIS DI PIT MUARA TIGA BESAR UTARA PT. BUKIT ASAM, TBK KABUPATEN MUARA ENIM, SUMATERA SELATAN

Baca Online BACA FULL TEXT ABSTRAK Pemesanan Versi cetak
Pengarang Teuku Muhammad Aulia Fatah - Personal Name
Subyek
Bahasa
Fakultas Fakultas Teknik
Tahun Terbit 2017

Abstrak/Catatan

ABSTRAK Pada pit Muara Tiga Besar Utara digunakan metode penambangan continuous mining, yaitu menggunakan Bucket Wheel Excavator. Dalam pit penambangan tersebut terdiri dari beberapa alat mekanis yaitu dua Bucket Wheel Excavator (BWE 203 dan BWE 205), dua unit Belt Wagon, dua unit Cable Rail Car, dua unit Hopper Car, dan satu unit Spreader. Produksi harian yang direncanakan untuk kedua Bucket Wheel Excavator setiap harinya ditentukan oleh nilai specific production factor yang merupakan nilai yang didapatkan dari mine control centre, adapun nilai specific production factor yang ditentukan pada bulan Agustus 2015 untuk masing-masing Bucket Wheel Excavator adalah 13,25 (BWE 203) dan 13,03 (BWE 205). Total produksi rencana material tanah dengan menggunakan nilai specific production factor untuk kedua Bucket Wheel Excavator adalah 361.776,10 BCM/bulan dengan target produksi rencana 348.000 BCM/bulan. Dari proses perhitungan aktual, didapatkan hasil untuk satu kali cycle time adalah 12,07 detik dengan jumlah curahan 70 curahan/menit. Total produksi aktual tanah sebelum perbaikan kerja yang dihitung berdasarkan keadaan lapangan adalah 401.894,141 BCM/bulan, dengan nilai effisiensi kerja untuk BWE 203 adalah 30,6% dan BWE 205 adalah 29,4%. Setelah dilakukannya upaya perbaikan waktu kerja, maka total produksi meningkat menjadi 428.782,489 BCM/bulan, dengan nilai effisiensi kerja untuk BWE 203 menjadi 32,67% sedangkan nilai effisiensi kerja untuk BWE 205 menjadi 31,3%. Kata Kunci: Bucket Wheel Excavator, specific production factor, produktivitas aktual, effisiensi kerja ABSTRACT In Muara Tiga Besar Utara site that used continuous mining method, and using Bucket Wheel Excavator. In the mining site consists of some mechanical devices, that is two Bucket Wheel Excavators (BWE 203 and BWE 205), two Belt Wagons, two Cable Rail Cars, two Hopper Car, and a Spreader. The daily value productions are planned both of Bucket Wheel Excavators, for each day is determined by the specific production factor, which is the value that obtained from the mine control center. The value of specific production factor determined in August 2015 to each of Bucket Wheel Excavator is 13.25 (BWE 203) and 13.03 (BWE 205). Total overburden production plan by using specific production factor values are both of Bucket Wheel Excavators are 361,776.10 BCM/month with plan productions target are 348,000 BCM/month. From the actual calculation process, the result for one cycle time is 12.07 seconds and total outpouring for a minute is 70 outpouring/min. Total actual overburden production before repairing work time are calculated are 401,894.141 BCM/month, with the value of BWE 203 job efficiency is 30,6% and for the BWE 205 is 29.4%. In an effort to improve the working time, the total production increased to 428,782.489 BCM/month, with the value of BWE 203 job efficiency is 32,67% and the value of BWE 205 job efficiency is 31,3%. Keyword: Bucket Wheel Excavator, specific production factor, actual productivity, job efficiency

Tempat Terbit Banda Aceh
Literature Searching Service

Hard copy atau foto copy dapat diberikan dengan syarat ketentuan berlaku, jika berminat, silahkan isi formulir online (Formulir Online)

Share Social Media

Tulisan yang Relevan

ANALISIS TEKNIS PENGGUNAAN PERALATAN KAPASITAS BESAR UNTUK PEMINDAHAN OVERBURDEN BULAN AGUSTUS 2016 DI PIT SUBAN TAMBANG AIR LAYA TANJUNG ENIM SUMATERA SELATAN (M. Iqbal, 2017)

KAJIAN TEKNIS PRODUKSI DAN TEORITIS ALAT MEKANIS PADA PENGUPASAN OVERBURDEN PIT TAMAN TAMBANG AIR LAYA PT. BUKIT ASAM (PERSERO) TBK TANJUNG ENIM SUMATERA SELATAN (Sayed Hubbul Walidainy, 2017)

ANALISIS KETIMPANGAN PENDAPATAN DAN PENGELUARAN ANTAR KECAMATAN DI KOTA LHOKSEUMAWE (DICKY AULIA, 2016)

EVALUASI DESAIN PELEDAKAN JENJANG UNTUK MENDAPATKAN FRAGMENTASI DAN BIAYA YANG OPTIMAL DENGAN TEKNIK DIGITAL IMAGE PROCESSING DAN KUZ-RAM MODEL (Titah Yaumil Rizki, 2017)

TINJAUAN PERENCANAAN HIDROLIS EMBUNG TAMPU KECAMATAN DELIMA KABUPATEN PIDIE PROPINSI ACEH (NOVITA DIANTAMI M, 2014)

  Kembali ke sebelumnya

Copyright © 2015 Perpustakaan Unsyiah. Dikembangkan dengan menggunakan SLiMS.